Topics under Quantity Surveying
Types of Footings
Plain footing, Step footing, Isolated footing, Plain Combined footing, Shoe-footing, Isolated Combined footing, Raft footing, Pile footing, etc.
Types of columns
Square or Rectangular Column, Circular Column, L-type column, T-type column, V-type column, Arc-type column, Hexagon type column, Y-type, Link or Stub column, etc.
Types of Beams
Types of Slabs
Flat Slab, Conventional Slab, One-way Slab, Two-way Slab, Hardy Slab, Waffle Slab, Hollow core rib-slab, Pitch Roof, Slab with arches, Sun-ken Slab or Depressed slab, Low roof, Loft or Chajja, Dome Slab, Post-tension slab, Pre-tension slab, Cable Suspension Slab, Grade Slab, Sun-Shade, Kitchen Platform, etc.
Types of walls
Brick Masonry wall (10cm & 20cm thick), C.R.S wall, R.R.S wall, Shear wall, Retaining wall, Drop wall, Load bearing wall, Pre-cast wall, Curtain wall, Core-wall, Parapet wall, Boundry wall or Compound wall, etc
- Types of Stair cases
- Types of Ramps
- Earth work Excavation & Back-fill Calculations
- Unit conversion-one/two/three -dimension conversion.
- Length calculation.
- Area calculation.
- Volume calculation.
- Module-I -Sub-structure calculation [Item below ground level].
- Module-II -Super-structure calculation [item above ground level].
- Module-III -Reinforcement calculation for R.C.C and Steel structure.
- Module-IV -Computer Application (MS Excel sheet and Auto-cad).
- Module-V -Project work.
- R.C.C- Footings
- P.C.C-under Footings
- Neck column
- Tie beam and Strap beam
- P.C.C,under Tie beams
- Plinth beam or Ground Beams.
- P.C.C.under Plinth Beams
- Retaining wall
- P.C.C,under Retaining wall
- Water calculation
- Rectangular sump
- Circular sump
- Septic tank
- Lift pit
- Earth work Excavation calculation
- Back- Fill calculation
- Abstract for the Quantity of Sub-structure.`
- Bill of Quantities
- Concrete proportions and Ratios with mix-design
- Area of shuttering in m2
- Area of bitumen paint in m2
- Area of termite control in m2
- Area of polythene sheet or Vapour Barrier in m2
- Reinforcement in Kgs or Tones
- Floor beams
- Floor slabs
- Stair cases (Typical & Semi-Circular)
- Ramp (Straight & Semi-Circular)
- Parking plat-form
- Brick work (No. of bricks required)
- Cement: Mortar required for brick work & Plastering
- Wall putty calculation
- Paint calculations in Litres (Emulsion paint & Enamel paint)
- False-Ceiling Calculations in m2
- Flooring Calculations (Marble tiles, Vitrified tiles, Parking tiles & inter-lock tiles)
- Wall Skirting Calculations
- Wall Tiles (Ceramic Tiles) calculations
- Wood calculations for doors & windows
- Doors & Windows Fittings (Tower bolt, door handle etc)
- Windows grill, Glass, and Iron gate calculations
- Over-Head Water tank Calculations
- Plumbing & Sanitation Details
- Expansion Joint Details
- Calculations for Pre-cast Walls, Columns, Slabs etc.
- Calculation for the miscellaneous item (Lintel, Loft (Chajjas), Window Sunshade & Kitchen Platforms).
- Abstract for the quantities of super structure
- Bill of quantities for super structure
- Honey Comb details
- All Calculation on MS Excel Sheet (Computer)
Bill of Quantities (B.O.Q)
- Submittal report for the approval of materials
- Project Stages Report
- Project Deliverables Report
- Weekly Report & Monthly Report
- Variations
- Value Engineering Meeting
- Minutes of Meeting
- Workshop
- Tender Documentation
- Procurement
No comments: